Dai Phong Wind Farm

Dai Phong Wind Farm

2020-10-01 10:06:48 1943
Dai Phong Wind Farm

Thien Nghiep, Phan Thiet, Binh Thuan
Dai Phong wind power project has a total investment of about 1,300 billion VND, on an area of ​​temporary use of about 12.7 ha. It is conducted in 2 phases and has a term of operation for 50 years from June 2018. The project uses 10 V150 wind turbines with a 73.7m long rotor diameter supplied by Vestas with a capacity of 4.2MW 
The project consists of 10WTGs, which will have the largest rotor diameter in Southeast Asia with Vestas supplying the first V150-4.2MW in Southeast Asia.